THpetro Tongshi THS5452TXJ3 Well-workover rig truck (#205)
THpetro Tongshi well-workover rig truck THS5452TXJ3 (batch #205) is made in China by Tonghua Petrochemical Machinery Manufacturing Co., Ltd. The company is located in Tonghua, in Jilin Province, China.
THS5452TXJ3
Overview
Model | THS5452TXJ3 |
Brand Name | THpetro Tongshi |
Bulletin | #205 |
Type of vehicle | Well-workover rig truck |
Country of origin | China |
Chassis | mfg by Hubei Sanjiang Space Wanshan Special Vehicle Co., Ltd. - a subsidiary of China Sanjiang Space Group (CSSG) / China Aerospace Science and Industry Corporation (CASIC), China |
Manufacturer Profile
Manufacturer | Tonghua Petrochemical Machinery Manufacturing Co., Ltd. |
Brand | |
Type of manufacturer | Machinery manufacturer |
City | Tonghua |
Province (Region) | Jilin Province |
Country | China |
Number of vehicles* | 166 models (294 items total) |
* A number of models manufactured by Tonghua Petrochemical Machinery Manufacturing Co., Ltd. found in Auto-che.com vehicle database |
Technical specifications
Performance | ||||
---|---|---|---|---|
Maximum speed | 55 km/h | 35 mph |
Weights and Ground pressure | ||||
---|---|---|---|---|
Curb weight | 44710 kg | 44.7 t | 98,569 lbs | |
Gross vehicle weight rating | 44775 kg | 44.8 t | 98,712 lbs | |
Axle load distribution | 7890 kg / 7910 kg / 7000 kg / 21975 kg (tandem axle) 7.9 t / 7.9 t / 7 t / 22 t (tandem axle) 17,394 lbs / 17,439 lbs / 15,000 lbs / 48,447 lbs (tandem axle) |
Dimensions | ||||
---|---|---|---|---|
Overall length | 18700 mm | 61′5″ | ||
Overall width | 3100 mm | 10′3″ | ||
Overall height | 4200 mm | 13′10″ |
Undercarriage and Suspension | ||||
---|---|---|---|---|
Front overhang | 1855 mm | 6′2″ | ||
Rear overhang | 3335 mm | 11′0″ | ||
Angle of approach | 25° | |||
Angle of departure | 14° |
Miscellaneous | ||||
---|---|---|---|---|
Seating capacity | 1 | |||
Steering control | steering wheel |
Additional Information
The car is overloaded trucks, Reach: 3940mm. The main components of derrick, winch major oilfield workover process by lifting the tubing role.This upper part of the mast device can be removed.