Jiancheng JC5312THZZZ Ammonuim nitrate and fuel oil (ANFO) on-site mixing truck (#205)
Jiancheng ammonuim nitrate and fuel oil (ANFO) on-site mixing truck JC5312THZZZ (batch #205) is made in China by Harbin Jiancheng North Special Vehicle Co., Ltd. The company is located in Harbin, in Heilongjiang Province, China.
JC5312THZZZ
Overview
Model | JC5312THZZZ |
Brand Name | Jiancheng |
Bulletin | #205 |
Type of vehicle | Ammonuim nitrate and fuel oil (ANFO) on-site mixing truck |
Country of origin | China |
Chassis | mfg by China CNHTC Jinan Truck Co., Ltd. - a subsidiary of China National Heavy Duty Truck Group Co., Ltd. (Sinotruk), China |
Manufacturer Profile
Manufacturer | Harbin Jiancheng North Special Vehicle Co., Ltd. |
Brand | |
Type of manufacturer | Special purpose vehicle manufacturer |
City | Harbin |
Province (Region) | Heilongjiang Province |
Country | China |
Number of vehicles* | 224 models (548 items total) |
* A number of models manufactured by Harbin Jiancheng North Special Vehicle Co., Ltd. found in Auto-che.com vehicle database |
Technical specifications
Performance | ||||
---|---|---|---|---|
Maximum speed | 75 km/h | 47 mph |
Weights and Ground pressure | ||||
---|---|---|---|---|
Curb weight | 15870 kg | 15.9 t | 34,987 lbs | |
Gross vehicle weight rating | 31000 kg | 31 t | 68,000 lbs | |
Axle load distribution | 6500 kg / 6500 kg / 18000 kg (tandem axle) 6.5 t / 6.5 t / 18 t (tandem axle) 14,300 lbs / 14,300 lbs / 40,000 lbs (tandem axle) |
Dimensions | ||||
---|---|---|---|---|
Overall length | 10200 mm | 33′6″ | ||
Overall width | 2500 mm | 8′3″ | ||
Overall height | 3650 mm | 12′0″ |
Undercarriage and Suspension | ||||
---|---|---|---|---|
Front overhang | 1560 mm | 5′2″ | ||
Rear overhang | 2490 mm | 8′3″ | ||
Angle of approach | 22.7° | |||
Angle of departure | 13.5° |
Miscellaneous | ||||
---|---|---|---|---|
Seating capacity | 2 | |||
Steering control | steering wheel |
Additional Information
Top compartment closed, not open.Transport medium: latex matrix. The car drove to the job site, starting power take off, the drug delivery hose inserted into the bottom of the hole, the start of injection materials, drug delivery hose will slowly pick up raw materials installed in the water below, a charge is complete.