Newway CXL5070ZYS Garbage compactor truck (#230)
Newway garbage compactor truck CXL5070ZYS (batch #230) based on NKR77LLPACJAY chassis is made in China by Sichuan Road Sanitation Equipment Co., Ltd. The company is located in Chengdu, in Sichuan Province, China.
CXL5070ZYS
Overview
Model | CXL5070ZYS |
Brand Name | Newway |
Bulletin | #230 |
Type of vehicle | Garbage compactor truck |
Country of origin | China |
Chassis | NKR77LLPACJAY |
Manufacturer Profile
Manufacturer | Sichuan Road Sanitation Equipment Co., Ltd. |
Brand | |
Type of manufacturer | Commercial vehicle manufacturer |
City | Chengdu |
Province (Region) | Sichuan Province |
Country | China |
Number of vehicles* | 28 models (51 items total) |
* A number of models manufactured by Sichuan Road Sanitation Equipment Co., Ltd. found in Auto-che.com vehicle database |
Technical specifications
# | Engine model | Engine displacement | Engine power | Engine manufacturer | |||
---|---|---|---|---|---|---|---|
1 | 4KH1-TC | 2999 cc | 3.0 L | 184 cu in | 96 kW | 131 hp |
Performance | ||||
---|---|---|---|---|
Maximum speed | 100 km/h | 63 mph |
Weights and Ground pressure | ||||
---|---|---|---|---|
Curb weight | 4730 kg | 4.7 t | 10,428 lbs | |
Gross vehicle weight rating | 7300 kg | 7.3 t | 16,100 lbs | |
Axle load distribution | 2500 kg / 4800 kg 2.5 t / 4.8 t 5,500 lbs / 10,600 lbs |
Dimensions | ||||
---|---|---|---|---|
Overall length | 6360 mm | 20′11″ | ||
Overall width | 2000 mm | 6′7″ | ||
Overall height | 2500 mm | 8′3″ |
Undercarriage and Suspension | ||||
---|---|---|---|---|
Number of axles | 2 | |||
Wheelbase | 3360 mm | 11′1″ | ||
Front overhang | 1015 mm | 3′4″ | ||
Rear overhang | 1985 mm | 6′7″ | ||
Angle of approach | 24° | |||
Angle of departure | 12° |
Miscellaneous | ||||
---|---|---|---|---|
Seating capacity | 2 | |||
Steering control | steering wheel |
Additional Information
Side guards Material: Rectangular Pipe Q235, 50 × 30 × 2mm, connected with the frame bolts due to the men along the vehicle off the ground high 480mm, not after the installation of the lower guard.